7 November 2026
Fleet tech & telematics
11 min read

Electric trucks problems 2027: the EU wants trucks electric by 2030, but can you charge one?

EAFO counted 373 operational 350 kW+ truck charging locations in April 2026, while T&E finds electric trucks cheaper to run in 6 of 9 EU markets.

Logifie Team

Logifie Team

Logistics Technology Experts

An electric truck tractor unit plugged into a charging point at a quiet logistics depot at dusk, with an empty motorway behind

You can charge an electric truck in Europe in 2027, but public charging for HGVs is still thin, and the International Road Transport Union (IRU) expects most charging to happen at depots. The European Alternative Fuels Observatory (EAFO) counted 373 operational locations with 350 kW or more in April 2026 , while the European Automobile Manufacturers' Association (ACEA) says at least 700 more truck chargers are needed every month (reported 2026-09-15). This post was written on 2026-11-07 and sets the figures from IRU, ACEA and the clean-transport campaign group Transport & Environment (T&E) side by side, then ends with which fleets should buy in 2027 and which should wait or run a pilot.

The headline needs one qualification. The EU CO2 rule for heavy trucks obliges manufacturers, not hauliers, so no fleet is legally required to buy an electric truck. The pressure reaches you through supply: truckmakers must cut their fleet-average emissions, and that shapes which trucks they offer and at what price.

Can you actually charge an electric truck in Europe in 2027?

Yes, but the answer depends on where the truck sleeps. At a depot you control the plug, the schedule and the tariff. On a long public route you depend on a network that is still being built.

IRU says most charging will happen at depots, and that securing grid capacity there typically takes one to two years (IRU, 2026-10-22). That lead time is the first practical problem for a fleet: the truck can arrive before the connection does.

On the public side, Milence reported 39 hubs operational and 11 under construction ( electrive, 2026-10-24 ). Its Temse hub in Belgium has 4 MCS/CCS bays of up to 1,500 kW and 4 CCS bays of up to 400 kW. The ad-hoc price there was EUR 0.379/kWh excluding VAT. That is one hub on one date, so treat it as a data point and not as a Europe-wide tariff.

For a route-by-route view, find where to charge an electric truck in Europe . For the rollout along main freight routes, follow how the nine-country electric truck corridors are being built .

How many public truck chargers does Europe have, and how many does it need by 2030?

The count ranges from 373 operational 350 kW locations (EAFO) to 2,405 recharging points (EAFO) or fewer than 2,000 suitable chargers (ACEA), because the definitions differ. IRU and ACEA both say far more are needed. The figures below come from three bodies that use different definitions, so compare them with care.

SourceDateFigureWhat it counts
EAFOApril 2026 data, published 2026-05-28373 locationsOperational locations meeting the 350 kW criterion
EAFO (same dataset)April 2026 data2,405 points, 1,225 stationsRecharging points and stations in 21 countries
IRU2026-10-221,225 stations; need estimated at 50,000 high-power pointsPublic truck-capable stations; the 50,000 has no stated source
ACEA via trans.info2026-09-15Fewer than 2,000 chargers; 700 more needed each monthPublic chargers suitable for heavy trucks

EAFO also splits its April 2026 locations into 278 mixed-use sites (1,838 points) and 95 sites used only by heavy-duty vehicles (567 points). Sweden, the Netherlands and Germany lead the count.

The legal yardstick is the Alternative Fuels Infrastructure Regulation. Under Article 4(1) of Regulation (EU) 2023/1804 , charging pools for heavy-duty vehicles (HDVs, the legal term for HGVs) must cover at least 50% of the TEN-T network length by 2027-12-31. By 2030-12-31, core network pools are due every 60 km (at least 3,600 kW with two 350 kW points) and comprehensive network pools every 100 km. Safe and secure parking areas need at least two HDV stations of 100 kW or more by 2027-12-31, and four by 2030-12-31.

This post could not verify whether the 2025-12-31 step (pools on at least 15% of TEN-T length) was met, so it makes no claim either way. IRU also warned in a joint letter on 2026-01-20 that a funding pause in 2026-2027 would slow deployment.

Are electric trucks really 2 to 3 times the price of diesel?

IRU says so, and it has said so consistently. In its Green Compact survey release of 2026-10-22 (IRU and Trimble, more than 1,000 operators in 36 countries), IRU stated that an electric truck costs two to three times as much as its diesel equivalent . It made the same point on 2025-02-12, adding that the gap is hard for SMEs to carry without targeted support.

IRU gives no calculation behind the ratio. No dated, verifiable EUR list price for a heavy e-tractor was available when this post was written, so it does not quote one. The practical step is to ask two or three dealers for a written quote for your own spec and compare it with a diesel offer for the same job.

A high purchase price does not settle the cost question on its own. Running costs over the life of the truck are the gap T&E modelled over five years.

Are electric trucks cheaper to run than diesel in 2027?

In T&E's model, yes in 6 of 9 major EU markets. T&E reported on 2026-09-28 that electric trucks have a lower five-year total cost of ownership than diesel in 6 of the 9 markets it modelled , which together make up 46% of new EU heavy truck sales.

The headline savings are:

  • Up to EUR 100,000 in the Netherlands and EUR 85,000 in Germany at current diesel prices.
  • Up to EUR 123,000 in the Netherlands and EUR 106,000 in Germany with high diesel prices.
  • A payback of about 2 years.

T&E expects all 9 markets to be cheaper by 2030 when combined with measures such as toll exemptions, even as purchase subsidies phase out. The result is modelled, not measured on real fleets, and in the other 3 of the 9 markets electric trucks are not yet cheaper in T&E's results.

Tolls matter in this arithmetic. Germany extended its zero-emission truck toll exemption to 2031-06-30 (BMV press release, 2025-12-01).

IRU's price claim and T&E's cost finding can both hold. One describes what you pay on the invoice, the other what you pay over five years of operation. To build the comparison for your own fleet, compare electric truck and diesel total cost of ownership step by step.

What operational problems should a fleet plan for beyond price?

Plan for grid timing, funding risk and a thin public network before you plan for anything else. Range and payload depend heavily on the model and the route, so check them against the manufacturer data for specific trucks. Check models and ranges in the best electric trucks in Europe for 2027 .

Three problems are documented in the sources for this post:

  • Grid connection. IRU puts the typical wait for depot grid capacity at one to two years (2026-10-22). A fleet that orders trucks first and applies for power later risks having vehicles it cannot charge at full speed.
  • Funding continuity. IRU and partners warned on 2026-01-20 that charging availability is not guaranteed and that a 2026-2027 funding pause would slow deployment.
  • Uneven markets. In H1 2026, Germany, the Netherlands and France accounted for 74% of electrically chargeable truck registrations (electrive, 2026-07-29). A fleet in a smaller market has fewer peers to learn from.

Sales are growing from a low base. In January to September 2026, ACEA data reported by electrive on 2026-10-29 shows 245,079 new EU trucks of 3.5 t and above, with electrically chargeable trucks at 5.3% of registrations (up from 3.8%) and diesel at 91.7%. Among heavy trucks of 16 t and above, 5,120 of 205,857 were electric, a 2.5% share (up from 1.7%). Medium trucks reached 7,753 electric units, a 19.8% share.

Why do IRU, T&E and ACEA disagree, and who is right for your fleet?

They are answering different questions, so each can be right on its own terms. IRU speaks for road transport operators and focuses on upfront cost and charging. T&E is a clean-transport campaign group and models running cost. ACEA speaks for manufacturers and focuses on the 2030 compliance date.

BodyDatePositionLimit to keep in mind
IRU2026-10-22Electric trucks cost two to three times diesel; public charging is scarceNo stated basis for the ratio or the 50,000 charger estimate
T&E2026-09-28Lower five-year cost in 6 of 9 markets; payback about 2 yearsModelled result, not fleet data
ACEA2026-09-15Delay the 2030 CO2 compliance timeline by three years, effectively to 2033Speaks for truckmakers; not adopted

ACEA made its request at IAA Transportation in Hanover, with the CEOs of DAF, Daimler Truck, Ford Otosan, Iveco Group, MAN, Scania and Volvo Group behind it (as reported by trans.info ). Karin Radstrom, Daimler Truck CEO and chair of the ACEA Commercial Vehicle Board, called for faster supporting measures and a three-year delay.

ACEA's figures: 2.4% of new heavy-duty trucks registered in Europe are zero-emission, with Germany at 4.3%, France at 2.4%, and Poland, Spain and Italy below 1%. ACEA says missing the 2030 target by three percentage points could cost the industry about EUR 2.2 billion.

The law as it stands is Regulation (EU) 2024/1610 . It requires manufacturer fleet-average CO2 cuts against the 2019 reporting period of 15% for 2025-2029, 45% for 2030-2034, 65% for 2035-2039 and 90% from 2040. Article 15 sets a Commission review by 2027-12-31. Regulation (EU) 2026/1046, published in the Official Journal on 2026-05-07, eased the credit calculation for 2025-2029 and left the targets unchanged.

As of 2026-11-07 the Commission had published no proposal to delay the 2030 date. For fleet planning, assume the target stands until a proposal appears. Read the EU truck CO2 standards review explained for what the Commission must assess.

Which routes and fleets should buy an electric truck in 2027, and who should wait?

An electric truck fits best where it returns to your own depot each night and charges there. Where the route depends on public charging, wait or run a pilot. This is the Logifie reading of the sources above, not a finding from any one of them.

Fleet or route type2027 verdictReason
Depot-based regional haulageGood fit nowIRU expects most charging at depots, and T&E models a lower five-year cost in 6 of 9 markets
Medium-truck distribution from a depotGood fit, pilot firstMedium trucks already reach a 19.8% electric share in Jan-Sep 2026 registrations
Long-haul internationalWait or pilotPublic network is thin (EAFO: 373 operational 350 kW+ locations, April 2026) and the AFIR 2030 spacing targets are still years away
Owner-driver without depot powerWaitNo home charging, high purchase price (IRU, 2025-02-12) and limited public points
Fleets in markets outside DE, NL and FRPilot firstSmaller peer group (DE, NL and FR took 74% of registrations in H1 2026)

Whatever the verdict, apply for the grid connection before you place the truck order, because it can take one to two years.

Frequently asked questions

Does the EU require hauliers to buy electric trucks?

No. Regulation (EU) 2024/1610 sets CO2 targets for manufacturers: a 45% fleet-average cut against the 2019 reporting period for 2030-2034. Hauliers face no purchase obligation, though the rule shapes which trucks manufacturers sell.

Will the 2030 CO2 target be delayed?

ACEA asked for a three-year delay on 2026-09-15, but as of 2026-11-07 the Commission had published no proposal to do so. The legal review under Article 15 is due by 2027-12-31.

How much does public truck charging cost?

One published price is EUR 0.379/kWh excluding VAT, the ad-hoc price at Milence's Temse hub in Belgium (electrive, 2026-10-24). Prices differ by operator, country and contract, so request a tariff from the networks on your route.

Are electric trucks exempt from tolls?

In Germany, the zero-emission truck toll exemption runs to 2031-06-30, according to a BMV press release of 2025-12-01. Check national rules for each country you cross.

How long does a depot grid connection take?

IRU says securing grid capacity at a depot typically takes one to two years (2026-10-22). Contact your network operator before you order trucks.

Where are electric trucks selling fastest?

Germany, the Netherlands and France made up 74% of electrically chargeable truck registrations in H1 2026 (electrive, 2026-07-29). ACEA puts the zero-emission share of new heavy-duty trucks at 4.3% in Germany and 2.4% in France (2026-09-15).

Before you talk to a dealer or a network operator, estimate your cost per kilometre with the freight calculator so you can test their quotes against your own diesel baseline.

LGFI-1234567

Warsaw → Berlin

En Route
Loading completed
In transit
Unloading
Customs clearance

Shipment Tracking

Logifie
Shipment Tracking

Know Where Your Cargo Is. Anytime.

Enter your order number and security code to track your shipment status, route, and timeline in real-time.

  • Real-time status updates for every stop
  • Secure access with order number and tracking code
  • Full multi-stop timeline with timestamps
Free Driver AppiOS & Android

Everything a truck driver needs. Always free.

Find truck parking, compare fuel prices and track driver hours — no account needed, no subscription, no catch.

  • Truck Parking — Find certified rest areas & truck stops along your route
  • Fuel Prices — Compare live diesel prices at nearby stations
  • Driver Hours — Track driving time & mandatory rest periods
Download on the App StoreGet it on Google Play

Logifie Driver Assistant

by Logifie

Free

Truck Parking

50k+ spots

Fuel Prices

Real-time

Driver Hours

EU compliant

No account required

Electric trucks problems 2027: the EU wants | Logifie